Language: EN | 中文 |

Water Piping System, Fittings, Valves & Design Workshop (26 June 2014) Armada Hotel PJ

 

 

 

 

IPA

FOCUSING ON

  • Principles
  • Water Flow In Pipes
  • Pipe Systems
  • Pipes & Fittings
  • Valves
  • Applications Of Valves
  • Practical Considerations

PIPING DESIGN WORKSHOPS

  • Water Piping Design
  • Workshop 1: Pipe Supports .
  • Workshop 2: Pipe Sizing
  • Workshop 3: Domestic Water System

CALCULATOR REQUIRED


WHO SHOULD ATTEND

  • Consulting Engineers
  • Maintenance Engineers
  • Project Engineers
  • Maintenance Superintendents
  • Maintenance Personnel
  • Service Engineers
  • M & E Foremen
  • Chargemen & Technical Executives
  • Technical Assistants
  • Technical Co-ordinators
  • Facility Operation Personnel
  • Technicians who deal with Water Piping System
  • New/Trainee Engineers
  • Contractors

METHODOLOGY


Lectures, Discussion, Exercises & Calculations to ensure participants have a better understanding
to improve their efficiency level.


LEARN FROM THE BEST

DR. LING FOON FATT has extensive experience in Education, R & D, Training, Consultancy and Manufacturing, having held various posts and positions with the following organizations:

  1. Associate Professor, Mechanical Engineering Department, University of Malaya (1981 - 1994).
  2. Technical Advisor, OYL Industries Bhd.(1987-1994)
  3. Chief Executive Officer, TOPAIRE Sdn. Bhd.(1994-1996)
  4. Senior Group General Manager, Top Group Holdings Bhd.
  5. Director of a Consulting Engineering Firm.
  6. Engineering & Training Advisor, UMJ Air-Conditioning Sdn. Bhd.
  7. Member of International Editorial Advisory Board, Journal of Energy, Heat and Mass Transfer.(1988-1994)

Dr. Ling has been the Principal Interviewer for the Examination of Corporate Membership of the Institution of Engineers, Malaysia (1976-1983); Chairman, Sub-Committee in Qualification Assessment, The Institution of Engineers, Malaysia (1981-1983); and The Council Member of the Institution of Engineers, Malaysia (1981/82-1983/84).

He was a member of the Steering Committee on Training and Entrepreneur Development, Federation of Malaysia Manufacturers (1992 - 1996).

Dr. Ling has supervised more than 80 engineering thesis projects, and published over 50 technical papers in International and regional journals.

 

IPA

 

Here Is What You Will Learn


9.00 PRINCIPLES

  • Flow Velocity & Volume
  • Water Column
  • Velocity Head
  • Continuity Equation
  • Energy Equation
  • Pressure Losses
  • Work Examples

9.30 WATER FLOW IN PIPES

  • Streamline Flow
  • Turbulent Flow
  • Reynolds Number
  • Friction Factor
  • Moody Chart
  • Work Examples

10.00 PIPE SYSTEMS

  • Typical Pipe System Components
  • Minor Losses
  • Entrance & Exit Losses
  • Sudden Expansion & Contraction Losses
  • Equivalent Length
  • Work Examples

10.45 PIPES & FITTINGS

  • Piping Components
  • Types of Pipes
  • Pipe Fittings
  • Methods of Joining

11.15 VALVES

  • General Purpose Valves
  • Valves Construction Details
  • Globe Valves
  • Gate Valves
  • Butterfly Valves
  • Ball Valves
  • Check Valves
  • Plug Valves

APPLICATIONS OF VALVES

  • GATE Valves, Advantages & Disadvantages
  • Typical Gate Valve Applications
  • Globe Valve, Advantages & Disadvantages
  • Typical Globe Valve Applications
  • Butterfly Valve, Advantages & Disadvantages
  • Typical Butterfly Valve Applications
  • Stop Valves
  • Selection Parameters

12.00 PRACTICAL CONSIDERATIONS

  • Strainers
  • Air Vents
  • Valve Losses
  • Fitting Losses
  • Cavitation in Valves
  • Water Hammer

1.00 Lunch

 

PIPING DESIGN WORKSHOPS

 

2.00 WATER PIPING DESIGN

  • Prelude to Water Piping Design
  • General Considerations
  • Effect of Erosion
  • Recommended Water Velocities
  • Water Piping Design Steps

WORKSHOP 1: PIPE SUPPORTS .

  • Remarks on Pipe support Design
  • Spacing for Pipe Support
  • Pipe Expansion
  • Pipe Bends & Loops
  • Z Bends
  • Work Examples

2.45 WORKSHOP 2: PIPE SIZING

  • Application of Pipe Friction-Loss Chart
  • Cooling Tower Pipe Sizing
  • Work Examples

3.45 WORKSHOP 3: DOMESTIC WATER SYSTEM

  • Design Loads
  • Method of Probability
  • Pipe Sizing
  • Piping Installation

5.00 End of Course

 

cfee

The fee per person is RM995.
The full fee is requiredwith your registration.
The full fee is required with your
registration. The fee includes luncheon, coffee/tea breaks and notes.
2 persons registered are entitled to a10%discount. Further discounts are availablefor larger groups.


Written Cancellation

Registration cancelled 7 days prior to the event are subject to a RM200 service charge. There will be no refunds for notice received less than 7 days prior to the event. A substitute may be made at any time at no extra cost.

cUs

CALL Juliany @ 019 3134436

juliany@ipa.com.my

Ana @ 019 3637822
ana@ipa.com.my


For Customised In-House Training

CALL Yvonne@ 012 2011247
yvonne@ipa.com.my
www.ipa.com.my


ADDRESS
A-28-5, Menara UOA Bangsar,
No.5, Jalan Bangsar Utama 1,
59000 Kuala Lumpur